PROPERTY INITIATIVES Case Study

Design, build and fit-out

Property Initiatives

Future were appointed by the Landlords to fully refurbish the common parts within this landmark town centre building together with various tenant related areas. Operating a carefully planned churn programme we disabled the existing VAV HVAC system and replaced it with a new VRV FCU air conditioning system together with replacement raised access floors, LED lighting and Metal Ceilings.

  • Property Initiatives
  • Surrey
  • A
  • 80,000 sq ft
  • 60 weeks
p