BFI Case Study

Design, build and fit-out

The British Film Institute

A strip out and Category A and B fit out while the tenant remained in occupation required careful planning and use of swing space throughout several phases of work. A new raised access floor, fire alarm and lighting systems were introduced as a template for future works in this owner occupied building with multiple uses including cinema spaces and a public library.

  • The British Film Institute (BFI)
  • London
  • A & B
  • 12,000 sq ft
  • 12 weeks